| 1 | Match the line with the target product | Process type, fiber, fabric structure, and GSM | Spunbond commonly covers approximately 10–250 g/m²; meltblown is often used for fine-fiber layers; needle-punched lines commonly produce heavier fabrics of about 100–2,000 g/m². | A line designed for the wrong process may not achieve the required strength, filtration, softness, or appearance. | Request trial production using the intended raw material, GSM range, fabric width, and end-use specification. |
| 2 | Calculate practical production capacity | Output per hour, day, and year | A practical estimate should use: kg/h = fabric width × GSM × line speed × 60 ÷ 1,000,000. Apply an operating efficiency of roughly 75–90% rather than using maximum rated output. | Rated capacity is normally higher than saleable output because of startup waste, roll changes, cleaning, maintenance, and downtime. | Compare guaranteed output at the actual GSM, width, polymer, and operating schedule required by the business plan. |
| 3 | Check operating speed, not only maximum speed | Stable production speed and speed range | Typical reference ranges vary by process: spunbond may operate around 300–800 m/min, meltblown around 50–300 m/min, and needle-punched lines around 5–30 m/min. | The highest speed may be available only at selected GSM values and may reduce uniformity or increase waste. | Ask for continuous-run records at the target product specification, including speed stability, waste percentage, and fabric quality results. |
| 4 | Evaluate usable working width | Nominal width, usable width, and edge trim | Commercial nonwoven lines are commonly configured from about 1.6 m to more than 6 m, depending on process and application. Usable width is normally less than nominal width. | A wider line can improve output, but only when the market can absorb the additional production and the downstream equipment matches the width. | Confirm finished-width tolerance, edge-trim allowance, roll diameter, winding width, and compatibility with cutting or laminating equipment. |
| 5 | Review flexibility and changeover time | GSM range, raw-material compatibility, and setup time | A flexible line may support multiple GSM values and polymers, but changes in polymer, color, width, or fabric structure can require cleaning and process adjustments lasting from less than 1 hour to several hours. | Shorter changeovers increase available production time and reduce material loss when serving multiple markets. | Request a documented changeover procedure with labor requirements, purge-material consumption, setup time, and first-quality-roll time. |
| 6 | Check utilities and operating cost | Installed power, compressed air, cooling, and floor space | Power demand depends on process and configuration. A complete assessment should include extruders, heaters, motors, pumps, fans, chillers, compressors, lighting, and auxiliary equipment. | Insufficient utilities can limit speed, cause unstable production, or increase energy consumption per kilogram. | Obtain a utility list with connected load, normal operating load, voltage, cooling-water requirements, compressed-air pressure, ventilation, and recommended layout area. |
| 7 | Confirm quality control and after-sales support | Uniformity, tension control, inspection, spare parts, and response time | Important controls include GSM variation, basis-weight profile, fabric width, tensile strength, elongation, roll hardness, winding tension, and visible-defect inspection. | Consistent quality reduces rejected rolls, customer complaints, rework, and unplanned downtime. | Include acceptance criteria, training, warranty terms, critical spare-parts availability, preventive-maintenance schedules, and remote or on-site technical support in the contract. |